Tools
The EIP Toolbox covers all key components of Eco-Industrial Parks including Resource Efficient and Cleaner Production (RECP), development of industrial synergies, strengthening park management, park selection and scoping EIP interventions, policy support and capacity-building.

A number of handbooks, brochures, tools and materials have been developed to support the implementation of EIP strategies. UNIDO has collaborated with international organizations to provide a common vision for EIPs. For instance, a close cooperation between UNIDO, the World Bank Group and the German Development Cooperation (GIZ) enabled to develop an international framework for eco-industrial parks. This framework provides a common understanding of EIPs and an approach for defining minimum performance requirements for EIPs.
To support the implementation of the International Framework for Eco-Industrial Parks, the objectives of UNIDO’s EIP Toolbox are to:
- Provide a practical set of customized and flexible tools to assist practitioners with the development and implementation of eco-industrial parks and related initiatives;
- Support EIP implementation and decision-making processes in relation to existing and new industrial parks.
Target users and application of the EIP Toolbox
The targeted users of the EIP tools are staff of international development organizations and supporting service providers working on eco-industrial park projects. The EIP Toolbox covers all key components of eco-industrial parks, including Resource Efficient and Cleaner Production (RECP), development of industrial synergies, strengthening park management, park selection and scoping EIP interventions, policy support and capacity building. This toolbox is intended to be applicable to:
- Industrial parks in various international contexts with a core focus on transition and developing countries;
- All development stages of industrial parks (e.g. scoping and concept planning, (pre-) feasibility studies, investment decisions, design and construction, operation, redesign and optimization);
- Industrial parks with different characteristics (e.g. types of industry sectors in park, park size, level of technology development, park management model).
Tools
The Eco-Industrial Parks tools set contains 9 different tools:
1. ASSESSMENT TOOL:
The objective of this tool is to assess an industrial park against the International Framework for Eco-Industrial Parks (UNIDO, WBG and GIZ, 2017) and subsequently identify, prioritize, plan, manage and monitor eco-industrial park initiatives. It can be used and adapted to all types of existing (brownfield) industrial parks and management structures (e.g. private company, public authority, public private set-up, real estate).
2. OPPORTUNITIES MONITORING TOOL:
The objective of this tool is to monitor and report resource savings and impacts from EIP opportunities identified and implemented in industrial parks with the support of (inter)national development projects.
3. POLICY SUPPORT TOOL:
The objective of this tool is to assist international development agencies (e.g. UNIDO) and its national partners with providing technical support to policy makers on EIP policy planning and development. It can be used as a practical tool to inform and guide the project team throughout the different stages of the policy development process in relation to Eco-Industrial Parks (e.g. from high level visioning to implementation, as presented in the main menu of this tool).
4. SELECTION TOOL:
The objective of this tool is to support the selection of industrial parks with a high potential for EIP development and creating successful, visible and replicable EIP projects. It is especially useful to assist in the selection of existing industrial parks that could be transformed in EIPs (brownfield), but it can also be used for the selection of area(s) that will host a new EIP (greenfield).
5. INDUSTRIAL SYMBIOSIS IDENTIFICATION TOOL:
The objective of the tool is to support the identification of industrial symbiosis opportunities (by-product and waste exchanges) between companies. This tool can be used in existing industrial parks (brownfields) to provide stakeholders with an indication of the symbiosis opportunities related to companies operating in the park. Alternatively, the tool can be used for new industrial parks (greenfields) to highlight possible industrial symbiosis between companies locating to the park, and thereby assist in the planning of infrastructures and utilities to enable these connections.
6. RECP MONITORING TOOL:
The objective of this tool is to monitor and report the resource savings and results of RECP assessments undertaken with companies in industrial parks. The tool provides a standardized method to calculate and monitor the economic, environmental and social benefits of RECP opportunities identified and implemented as part of UNIDO's EIP projects.
7. MANAGEMENT SERVICES TOOL:
The objective of this tool is to strengthen and advance the services provided by park management to tenant companies, and thereby increase "value for money" provided by park management to tenant companies and securing / expanding revenues of park management entity. The tool assist industrial park management entities and tenant companies with reviewing, prioritizing, scoping, and action planning of fit-for-purpose and added-value services to their park and tenant companies.
8. CONCEPT PLANNING TOOL:
The objective of this tool is to assist in the sustainable and integrated design and operation of industrial parks from an economic, environmental and community perspective by providing a systemic approach to incorporate demand-driven eco-industrial park opportunities into the concept planning of greenfield parks and brownfield parks.
9. MASTER PLAN EIP REVIEW TOOL:
The objective of this Master Plan EIP Review Tool is to guide the sustainability review of existing Master Plans of industrial parks, based on eco-industrial parks concepts and International Framework for Eco-Industrial Parks (UNIDO, WBG, GIZ), and thereby provide concrete suggestions for strengthening Master Plans.
The tools are available in 5 different languages. Please consult the tables below for the appropriate language versions of the EIP tools and for downloads.
Eco-Industrial Parks Tools:
Short Introduction to the EIP tools
Attachment | Size |
---|---|
Introduction to the EIP tools | 102.05 KB |
Інструментарій ЕІП ЮНІДО | 91.87 KB |
Manual para la caja de herramientas de PEI de ONUDI | 89.3 KB |
工发组织生态工业园区工具箱 | 142.6 KB |
Introduction to the EIP tools in Arabic | 138.97 KB |
EIP Toolboox Manual
Attachment | Size |
---|---|
Manual for UNIDO Toolbox on Eco-Industrial Parks | 828.41 KB |
Manual para la caja de herramientas de la ONUDI sobre Parques Eco-Industriales | 893.79 KB |
Посібник з використання інструментарію екоіндустріальних парків ЮНІДО | 966.82 KB |
工发组织生态工业园区 工具箱手册 | 1021.55 KB |
Manual for UNIDO Toolbox on Eco-Industrial Parks in Arabic | 3.02 MB |
The EIP Tools in English
Attachment | Size |
---|---|
ASSESSMENT TOOL | 595.58 KB |
OPPORTUNITIES MONITORING TOOL | 1.16 MB |
POLICY SUPPORT TOOL | 713.9 KB |
SELECTION TOOL | 686.14 KB |
INDUSTRIAL SYMBIOSIS IDENTIFICATION TOOL | 587.16 KB |
RECP MONITORING TOOL | 964.21 KB |
MANAGEMENT SERVICES TOOL | 665.98 KB |
CONCEPT PLANNING TOOL | 5.04 MB |
MASTER PLAN EIP REVIEW TOOL | 2.55 MB |
The Eco Industrial Parks Tools in Spanish
Attachment | Size |
---|---|
HERRAMIENTA DE EVALUACIÓN DE LOS PEI | 570.79 KB |
HERRAMIENTA DE MONITOREO ONUDI PEI | 743.06 KB |
HERRAMIENTA DE SELECCIÓN PEI | 626.79 KB |
HERRAMIENTA DE IDENTIFICACIÓN DE SIMBIOSIS INDUSTRIAL | 555.09 KB |
HERRAMIENTA DE APOYO DE POLÍTICAS PEI | 693.01 KB |
HERRAMIENTA DE MONITOREO RECP | 679.39 KB |
Manual para la caja de herramientas de la ONUDI sobre parques eco-industriales | 3.74 MB |
The Eco Industrial Parks Tools in Mandarin Chinese
Attachment | Size |
---|---|
生态产业园评估工具 | 569.87 KB |
生态工业园区发展机会监测工具 | 1.14 MB |
生态产业园政策工具 | 696.72 KB |
生态工业园区遴选工具 | 666.17 KB |
工业共生识别工具 | 553.55 KB |
资源高效利用和清洁生产监测工具 | 951.97 KB |
The Eco Industrial Parks Tools in Ukrainian
Attachment | Size |
---|---|
ІНСТРУМЕНТ ОЦІНКИ ЕІП | 599.3 KB |
ІНСТРУМЕНТ ДЛЯ МОНІТОРИНГУ МОЖЛИВОСТЕЙ В СФЕРІ ЕІП | 1.16 MB |
ІНСТРУМЕНТ ДЛЯ ПІДТРИМКИ ПОЛІТИКИ В СФЕРІ ЕІП | 682.09 KB |
ІНСТРУМЕНТ ДЛЯ ВІДБОРУ ЕІП | 687.99 KB |
ІНСТРУМЕНТ ДЛЯ ВИЗНАЧЕННЯ ІНДУСТРІАЛЬНОГО СИМБІОЗУ | 593.76 KB |
ІНСТРУМЕНТ РЕЧВ МОНІТОРИНГУ | 962.91 KB |
Посібник з використання інструментарію екоіндустріальних парків ЮНІДО | 2.36 MB |
The Eco Industrial Parks Tools in Arabic
Attachment | Size |
---|---|
Download here | 596.03 KB |
Download here | 1.16 MB |
Download here | 718.82 KB |
Download here | 687.58 KB |
Download here | 588.42 KB |
Download here | 959.25 KB |
Download here | 3.02 MB |